I just started skein 14 of 18 on Britts blanket.I have to admit I'm getting kind of bored with it.I'm forcing myself to work on it. My goal is 3 skeins a week. I'm on my second skein for this week so I'm not doing that bad. I will admit that I started Bradys ripple last night and I have just started the 3rd skein.I think I'm going to need more yarn for his, but I'm going to use what I have first and see, although I'm pretty sure I will.I may hold off even though yarn to finish projects is allowed, and start Aryns ripple after I finish the yarn I have for Bradys because I want to play with more colors.Not to mention, variety is the spice of life! I'm using Bumpy doinks pattern: http://bumpydoink.blogspot.com/2007/06/my-ripple-pattern.html
It makes a big enough blanket to fit across your bed without having to do any math.
I love it!
I normally can't get a ripple to work (this is my first successful attempt) so if your interested in crocheting one and haven't before I highly recommend this pattern.
TTYL
Showing posts with label Christmas knitting. Show all posts
Showing posts with label Christmas knitting. Show all posts
Tuesday, January 08, 2008
Wednesday, November 28, 2007
Finished sweater!
I have quite literally just finished Britts sweater. I did one row of single crochet around the neck edge and all the ends are woven in!Yarn is caron simply soft shadows in Fuschia Flare.I used 4 full skeins and a few yards of a 5th.

A garter stitch sweater loosely based on this pattern, mostly just used the cast on # and mesturements:
http://web.archive.org/web/20040606170200/http://www.thesmartyarns.com/guppy.html
ON TO THE SOCKS!

A garter stitch sweater loosely based on this pattern, mostly just used the cast on # and mesturements:
http://web.archive.org/web/20040606170200/http://www.thesmartyarns.com/guppy.html
ON TO THE SOCKS!
Fallen off the wagon
Big time. I have photographic evedance of my badness(I said yarn diet will resume friday remember!):

Left to right: Austerman step color 49,Jarbo Garn mini raggi ball band in Sweedish so I'm not sure of the color, Patons SWS color Natural plum , lion cotton in candy colors, a shawl pin I found for $1.99, Penguin ornament $1.99 ( I have a thing for Penguins) and a set of lock eyes for stuffed animals.
Theres only about 2 more inches left on the front of my nieces sweater before I start the neck. So that's the tale of my badness, my friend Lara can attest that I have no will power as well as no more money.Anyway. TTYL

Left to right: Austerman step color 49,Jarbo Garn mini raggi ball band in Sweedish so I'm not sure of the color, Patons SWS color Natural plum , lion cotton in candy colors, a shawl pin I found for $1.99, Penguin ornament $1.99 ( I have a thing for Penguins) and a set of lock eyes for stuffed animals.
Theres only about 2 more inches left on the front of my nieces sweater before I start the neck. So that's the tale of my badness, my friend Lara can attest that I have no will power as well as no more money.Anyway. TTYL
Tuesday, November 27, 2007
Crunch time!
Yea, I know it's not December yet , but wether we like it or not it's less than a month away from Christmas and our needles are clicking at full speed ahead!
I need to finish the front of my nieces sweater and the foot and toe of a sock.
Stu and I are car pooling again this coming week, so the socks should be done by my next weekend. I don't mind going to work an hour early if it means I don't have to spend my entire vacation stressing about getting my Christmas knitting done!
Then I might acually finish some of my other WIP's while I'm off for 5 days straight, a whole 3 of them with no distractions!
I'm also crocheting an afghan for my nephew who has been in the hospital with fluid on the lungs.
Simple granny squares in red heart classic. He's 3 1/2 so it's not super huge. Just a good cuddle size when he has to be away from home for long periods of time.
Colors are rust, true blue and emerald.
Any way on my vacation I hope to finish the following:
Socks and sweater if not completed at the time come first.
Next up is the green bunny and Totmen, then Nothin but a kids t-shirt in the 6 month size all that is left to knit is the sleeves that I wanted to alter to make longer.
My nephews blanket hopefully will get a fair amount of work as well as my dishcloth cotton granny (I'm up to 30 squares now!).Then I want to work on my magic 28 socks, I have another pair 1/2 finished I.E. first sock done awaiting ends being darned in second sock not yet cast on.I can't remember how many pairs I pledged but this will be my 3rd pair.They are going to Warm Woolies when I'm finished with my pledge.
Then after all that is finished I want to start a ripple with the cotton ease I bought this past summer.
I have broken my yarn diet to buy some dishcloth cotton and the yarn for my nephews blanket.The yarn diet will resume hopefully on friday.
I need to finish the front of my nieces sweater and the foot and toe of a sock.
Stu and I are car pooling again this coming week, so the socks should be done by my next weekend. I don't mind going to work an hour early if it means I don't have to spend my entire vacation stressing about getting my Christmas knitting done!
Then I might acually finish some of my other WIP's while I'm off for 5 days straight, a whole 3 of them with no distractions!
I'm also crocheting an afghan for my nephew who has been in the hospital with fluid on the lungs.
Simple granny squares in red heart classic. He's 3 1/2 so it's not super huge. Just a good cuddle size when he has to be away from home for long periods of time.
Colors are rust, true blue and emerald.
Any way on my vacation I hope to finish the following:
Socks and sweater if not completed at the time come first.
Next up is the green bunny and Totmen, then Nothin but a kids t-shirt in the 6 month size all that is left to knit is the sleeves that I wanted to alter to make longer.
My nephews blanket hopefully will get a fair amount of work as well as my dishcloth cotton granny (I'm up to 30 squares now!).Then I want to work on my magic 28 socks, I have another pair 1/2 finished I.E. first sock done awaiting ends being darned in second sock not yet cast on.I can't remember how many pairs I pledged but this will be my 3rd pair.They are going to Warm Woolies when I'm finished with my pledge.
Then after all that is finished I want to start a ripple with the cotton ease I bought this past summer.
I have broken my yarn diet to buy some dishcloth cotton and the yarn for my nephews blanket.The yarn diet will resume hopefully on friday.
Wednesday, October 03, 2007
My Monkey
This is my Monkey:

Finished mear moments ago, she is seen here, resting against one of my 2 large Batman pillows I made for our first appartment over a year and a half ago.
She is made of red heart sport weight scraps of an afghan, and the pattern Funky monkey from Mr. Funkys Super crochet wonderful by Narumi Ogawa.
I still have plenty of left overs I may make more. I also want to make Le Hamster out of some Cotton Ease scraps I have.
I made a voiage to Eau Claire with Mom and Aunt Lisa (thanks again for lunch if your reading!!).
I got some awesome fabric at a fabric store just blocks down from Yellow Dog knitting, that I had never seen before even though I'd been past several times and oddly enough never seen it before.It's also a little gift store.
Now I'm saving some money because I want one of there Boyds bears. I have some smaller ones, but I REALLY want a larger one.
I also got some Swedish sock yarn recently available at Yellow dog. Self striping with an awesome blue with a black and white jaquard stripey thing going on. I cant wait to cast on!
I'm also trying to make tiny sock ornaments for our tree this year, But I'm not going to kill my self over it.
I really want to work on Bradys sweater, as it has been good to me and hasn't forced me to tears and a time out in the dresser.I may pull that out and give it some love later.
I also got the yarn for Bris sweater.Vannas choice ( I think I may have a problem..) Pink, Her favorite color. :)
Thats all for now,
TTYL

Finished mear moments ago, she is seen here, resting against one of my 2 large Batman pillows I made for our first appartment over a year and a half ago.
She is made of red heart sport weight scraps of an afghan, and the pattern Funky monkey from Mr. Funkys Super crochet wonderful by Narumi Ogawa.
I still have plenty of left overs I may make more. I also want to make Le Hamster out of some Cotton Ease scraps I have.
I made a voiage to Eau Claire with Mom and Aunt Lisa (thanks again for lunch if your reading!!).
I got some awesome fabric at a fabric store just blocks down from Yellow Dog knitting, that I had never seen before even though I'd been past several times and oddly enough never seen it before.It's also a little gift store.
Now I'm saving some money because I want one of there Boyds bears. I have some smaller ones, but I REALLY want a larger one.
I also got some Swedish sock yarn recently available at Yellow dog. Self striping with an awesome blue with a black and white jaquard stripey thing going on. I cant wait to cast on!
I'm also trying to make tiny sock ornaments for our tree this year, But I'm not going to kill my self over it.
I really want to work on Bradys sweater, as it has been good to me and hasn't forced me to tears and a time out in the dresser.I may pull that out and give it some love later.
I also got the yarn for Bris sweater.Vannas choice ( I think I may have a problem..) Pink, Her favorite color. :)
Thats all for now,
TTYL
Monday, September 17, 2007
I'm tired!
Working in a public place really makes you sick alot, both metophoric and phyisically.
I'm constant companion with Mr. Snuffy nose and Ms. Clogged head.
I wish I had more sick days.
I finished the second pair of magic 28 socks last night.I'm not casting on for another pair until I finish Britts sweater. Still working on the back.
My lap top has been down.It wont connect to the internet, and it's pissing me off.Other wise my cronic blog-reading would have allowed me to finish the back by now. I can only knit comfy and read the computer when sitting on the couch. So Stus desk top is my only access to the internet.I don't like it but it will do for now.
ttyl
I'm constant companion with Mr. Snuffy nose and Ms. Clogged head.
I wish I had more sick days.
I finished the second pair of magic 28 socks last night.I'm not casting on for another pair until I finish Britts sweater. Still working on the back.
My lap top has been down.It wont connect to the internet, and it's pissing me off.Other wise my cronic blog-reading would have allowed me to finish the back by now. I can only knit comfy and read the computer when sitting on the couch. So Stus desk top is my only access to the internet.I don't like it but it will do for now.
ttyl
Tuesday, September 11, 2007
COLD!
It turned f*ing cold this past week and I have been hiding under 2 of my blanket projects.
A nice large Lionbrand jiffy giant granny square planned as a lap blanket for mom for Christmas. Useing 2 different dye lots as stripes and a brown edging. Mom likes natural colors and this fits the bill.
Looking for my longer size 10's to continue my log cabin again.
I found a pattern for a crochet jacket that I WANT BADLY!
Already have the pattern and the yarn, want to finish something else first. 2 1/2 more skeins until moms blankets done. Maybe after that....
Going to the yarn shop tomorrow, hopefully will find something intresting...
On to the second sock of the second pair of magic 28 socks!
My order from knitpicks should be coming in a day or 2. The yarn is for a blanket for my niece.Larger than past blankets I've made for her.Hopefully twin size for her b-day next year.
If you thought I was going to say Christmas, you must really think I'm insane.
I'm talking her b-day next october.
TTYL
A nice large Lionbrand jiffy giant granny square planned as a lap blanket for mom for Christmas. Useing 2 different dye lots as stripes and a brown edging. Mom likes natural colors and this fits the bill.
Looking for my longer size 10's to continue my log cabin again.
I found a pattern for a crochet jacket that I WANT BADLY!
Already have the pattern and the yarn, want to finish something else first. 2 1/2 more skeins until moms blankets done. Maybe after that....
Going to the yarn shop tomorrow, hopefully will find something intresting...
On to the second sock of the second pair of magic 28 socks!
My order from knitpicks should be coming in a day or 2. The yarn is for a blanket for my niece.Larger than past blankets I've made for her.Hopefully twin size for her b-day next year.
If you thought I was going to say Christmas, you must really think I'm insane.
I'm talking her b-day next october.
TTYL
Tuesday, September 04, 2007
6 inches short
Until I get to the neck on the back of Britts sweater.
She spent the night last night, but I forgot to compare the completed parts up to her to see of they were right.... Oh well, maybe next time.
I hope I have enough yarn, I'm thinking I might but we will see when I finish the back, hopefully this week sometime. I have been taking it to work with me everyday.
I can't get anymore of this yarn, it was clearanced at Micheals and I got the last 5 skeins. So it HAS to be enough!!
She spent the night last night, but I forgot to compare the completed parts up to her to see of they were right.... Oh well, maybe next time.
I hope I have enough yarn, I'm thinking I might but we will see when I finish the back, hopefully this week sometime. I have been taking it to work with me everyday.
I can't get anymore of this yarn, it was clearanced at Micheals and I got the last 5 skeins. So it HAS to be enough!!
Thursday, August 30, 2007
I got it!
I got the yarn I won!!!!
It is so perfect!!!!I cant wait to cast on!!!!Thank you so much Bliss!!!It totally rocks!!!
In other news, I'm about 5 inches up the back of Britts sweater. Due to showing up at work at 2, rather than 3 when I was acually supposed to be!Past the ribbing into the garter st, wonderful for chatting and reading! I can see this going quickly!
I'm also to the point where I need to bind off the toe of my first magic 28 socks to start on the next!
TTYL, Hayley
It is so perfect!!!!I cant wait to cast on!!!!Thank you so much Bliss!!!It totally rocks!!!
In other news, I'm about 5 inches up the back of Britts sweater. Due to showing up at work at 2, rather than 3 when I was acually supposed to be!Past the ribbing into the garter st, wonderful for chatting and reading! I can see this going quickly!
I'm also to the point where I need to bind off the toe of my first magic 28 socks to start on the next!
TTYL, Hayley
Tuesday, August 28, 2007
Thursday, August 23, 2007
Workin hard....,
past the gusset on Marcies sox, straight down the foot I go!!!
My goal is to finish them in the next week. Wahoo!
It will be nice to finish something after so long....
My goal is to finish them in the next week. Wahoo!
It will be nice to finish something after so long....
Tuesday, August 21, 2007
Sleeves done!
I think I was smart to do the sleeves first on the size 5 sweater.
They were very quick and fun!
Now the front and back are just giant garter st rectangles, so I can see myself switching between the size 5 and size six sweater.
I think I'll be calling the size 5 sweater Britts sweater and the 6 Bradys, for the intended recipiants.
Britts is a fushia defuised by a strand running threw it that fades from black to navy to a slightly lighter pink.
Bradys is a dusty blue.
I also finished a log on the afghan and cant start a new one until I unearth my size 10 circs.It is now way to large for my 10 inch straights!
It's been rainy and cold. The perfect time for big afghan knitting!
A small bit on the socks have been worked.I'm on the heel of the second sock now.I'm just happy to be seeing results in my knitting again.
I feel like I've been in a stand still forever.It's nice to be moving again....
ttyl, Hayley
They were very quick and fun!
Now the front and back are just giant garter st rectangles, so I can see myself switching between the size 5 and size six sweater.
I think I'll be calling the size 5 sweater Britts sweater and the 6 Bradys, for the intended recipiants.
Britts is a fushia defuised by a strand running threw it that fades from black to navy to a slightly lighter pink.
Bradys is a dusty blue.
I also finished a log on the afghan and cant start a new one until I unearth my size 10 circs.It is now way to large for my 10 inch straights!
It's been rainy and cold. The perfect time for big afghan knitting!
A small bit on the socks have been worked.I'm on the heel of the second sock now.I'm just happy to be seeing results in my knitting again.
I feel like I've been in a stand still forever.It's nice to be moving again....
ttyl, Hayley
Thursday, August 16, 2007
I think it's working..
Last night I finished the first sleeve f the size 5 sweater and the ribbing on the second.
Tonight it's a bit chilly so I brought out the blanket and started a new block of color.
It's a log cabin and is at the point where it is getting just to big to finish an entire block in one sitting.
I also knit 2 or so rows on the sock.Hey at least it's something! :)
TTYL
Tonight it's a bit chilly so I brought out the blanket and started a new block of color.
It's a log cabin and is at the point where it is getting just to big to finish an entire block in one sitting.
I also knit 2 or so rows on the sock.Hey at least it's something! :)
TTYL
Wednesday, August 15, 2007
I need to finish something.....
I'm going out of my mind.I have recently started my Christmas knitting. 3 small sweaters sizes 6, 5 and 3 , for my neices and nephews. A pair of socks for a co worker, a blanket for my sister, and thats just what I have started!!!
I have 1 sock done and the other almost down to the heel, 1 sleeve on the size 5 sweater is well over 1/2 way done, to the yoke on the front of the 6 sweater. Blanket is 3 out of 8 skeins in.
I am devoting myself to posting here at least once a week to keep track of my progress.I really need to get to knitting if I'm going to have all this done!
The blanket has gotten to the point where it is way to hot for me to knit in this 80 + weather.
Socks are my work knitting.
The sweaters are small enough, one is garter st the other is a mix of basketweave and seed st. The 3rd is not started yet.
See you next week
I have 1 sock done and the other almost down to the heel, 1 sleeve on the size 5 sweater is well over 1/2 way done, to the yoke on the front of the 6 sweater. Blanket is 3 out of 8 skeins in.
I am devoting myself to posting here at least once a week to keep track of my progress.I really need to get to knitting if I'm going to have all this done!
The blanket has gotten to the point where it is way to hot for me to knit in this 80 + weather.
Socks are my work knitting.
The sweaters are small enough, one is garter st the other is a mix of basketweave and seed st. The 3rd is not started yet.
See you next week
Subscribe to:
Posts (Atom)